View Royal Casino: Expansion and Renovation, Vancouver
This 48,000 ft2 project includes gaming, entertainment and parking upgrades and improvements to the surrounding road, pedestrian and bikeway system. Sustainable design features include a green roof system that will assist with storm water management while reducing the building's cooling load.

   
       

Boulevard Casino: Hotel and Conference Center Expansion, Vancouver
The $80 M expansion includes a 200 room, 16 storey hotel, complete with 3 storey podium incorporating meeting, entertainment and dining facilities. Also included are upgrades to the existing casino. Maintaining uninterrupted operations throughout the project represents one of the biggest challenges for the project team.

   
       
Nanaimo Casino Expansion and Renovation, Nanaimo
This $22 M expansion and renovation is an important part of Nanaimo's downtown revitalization, tying into the new convention centre, library and hotel. The project includes a 2 level parkade and a number of sustainable features, in keeping with Nanaimo's vision for this vibrant harbourfront district.
   
 

New Projects

Schulich School of Engineering, Calgary
The project includes a three-phased development consisting of 467,000 ft2 of renovations to the six (6) existing engineering Blocks (A-F), followed by 164,000 ft2 of new engineering space and finally repurposing of spaces in the existing Engineering Complex.

Webber Academy, Calgary
This 28,797 ft2 expansion will house the new Performing Arts Centre featuring a 450-seat theatre with a 150-person stage and a lobby.

Rideau Centre, Ottawa
Pivotal is providing project advisory services to the Viking Rideau Corporation, which owns the land being developed for the new Congress Centre including 1,000,000 ft2 of retail space.

Commerce Court West, Toronto
Pivotal is providing complete project management services to oversee and manage the consultant team and general contractor for design management as well as construction on 50,000 ft2 station and 40,900 ft2 cross over.